Advanced Search  
KSN are proud to be a authorised Asus Gold Partner. Buy your Asus products with confidence from KSN.   KSN are proud to support Verified by Visa & Secure Code by MasterCard schemes. KSN
  Home » Catalog » Cart Contents My Account  |  Cart Contents  |  Checkout   
Categories
CCTV
Components
Computers
Consumables
Networking
Peripherals
Refurbished NB/PC
SmartPhones
Software
Sound & Vision
Storage
Toys
Workstation Boards/Systems
Xtra-Bargains
Specials
Newest Products
Goto...
Manufacturers
Our Bestsellers

01 - Gigabyte GC-TPM2.0 SPI 2.0 (12-pin) Trusted Platform Motherboard Module
Gigabyte GC-TPM2.0 SPI 2.0 (12-pin) Trusted Platform Motherboard Module

02 - MSI TPM 2.0 Trusted Platform 12-Pin Motherboard Module MS-4462 (SPI)
MSI TPM 2.0 Trusted Platform 12-Pin Motherboard Module MS-4462 (SPI)

03 - Canon CLI-521Y Yellow Ink Cartridge MP540, MP620, MP630, MP980, IP3600
Canon CLI-521Y Yellow Ink Cartridge MP540, MP620, MP630, MP980, IP3600

04 - Linx Tablet PC Windows 10 Recovery USB Drive
Linx Tablet PC Windows 10 Recovery USB Drive

05 - 75cm RED Serial ATA SATA III data cable HDD/DVD Keyed Left Right Angled Ang
75cm RED Serial ATA SATA III data cable HDD/DVD Keyed Left Right Angled Ang

06 - Linx 12X64 12.5" FHD Intel Quad Core 64GB 4GB Windows 10 Tablet Bundle with
Linx 12X64 12.5" FHD Intel Quad Core 64GB 4GB Windows 10 Tablet Bundle with

07 - MSI TPM 2.0 Trusted Platform 14-Pin Motherboard Module MS-4136 Win 11
MSI TPM 2.0 Trusted Platform 14-Pin Motherboard Module MS-4136 Win 11

08 - Dell Pro Thunderbolt 4 Smart Dock DELL-SD25TB4 (HDMI/2xDP/USB-C)
Dell Pro Thunderbolt 4 Smart Dock DELL-SD25TB4 (HDMI/2xDP/USB-C)

09 - +NEW+Intel Core i3-14100 Tray - (1700/4 Core/3.5GHz/12MB/Rocket Lake/60W/73
+NEW+Intel Core i3-14100 Tray - (1700/4 Core/3.5GHz/12MB/Rocket Lake/60W/73

10 - Alcatel 5V 1A 5W USB UNIVERSAL EU 2 Pin Mains Tablet Phone Power Charger Ad
Alcatel 5V 1A 5W USB UNIVERSAL EU 2 Pin Mains Tablet Phone Power Charger Ad
Reviews  more
There are currently no product reviews
Specials  more
MSI TPM 2.0 Trusted Platform 12-Pin Motherboard Module MS-4462 (SPI)
MSI TPM 2.0 Trusted Platform 12-Pin Motherboard Module MS-4462 (SPI)

£23.99 (inc VAT) / £19.99 (exc VAT)

What's In My Cart? What's In My Cart?
Remove Product(s) Qty. Total
Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Red) Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Red)
£134.00 (inc VAT) / £111.67 (exc VAT)
Pulsar PCMK3HE TKL Gaming Keyboard, 80%, ANSI, White Pulsar PCMK3HE TKL Gaming Keyboard, 80%, ANSI, White
£142.86 (inc VAT) / £119.05 (exc VAT)
Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, Volt Shadow Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, Volt Shadow**Currently Out Of Stock, but can be Pre-ordered Online. Please email us to check restock date prior to ordering.
£119.64 (inc VAT) / £99.70 (exc VAT)
Pulsar ZywOo The Chosen Medium Mouse Gen.2 (Wireless/Pink/32000dpi/5 Button Pulsar ZywOo The Chosen Medium Mouse Gen.2 (Wireless/Pink/32000dpi/5 Button
£117.41 (inc VAT) / £97.84 (exc VAT)
Pulsar Feinmann F01 Wireless Magnesium mouse Alpine White Pulsar Feinmann F01 Wireless Magnesium mouse Alpine White
£121.09 (inc VAT) / £100.91 (exc VAT)
Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Black) Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Black)
£134.00 (inc VAT) / £111.67 (exc VAT)
Pulsar X2 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto Pulsar X2 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto
£118.66 (inc VAT) / £98.88 (exc VAT)
Pulsar Xlite CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5 Pulsar Xlite CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5
£118.66 (inc VAT) / £98.88 (exc VAT)
Pulsar X2N CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5 Bu Pulsar X2N CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5 Bu
£116.57 (inc VAT) / £97.14 (exc VAT)
Pulsar X2H CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butt Pulsar X2H CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butt
£118.66 (inc VAT) / £98.88 (exc VAT)
Pulsar Superglide for Logitech G PRO X Superlight 2 Control Black Pulsar Superglide for Logitech G PRO X Superlight 2 Control Black**Currently Out Of Stock, but can be Pre-ordered Online. Please email us to check restock date prior to ordering.
£20.18 (inc VAT) / £16.82 (exc VAT)
Pulsar Superglide 3 Glass Mousepad Speed - XL - White Pulsar Superglide 3 Glass Mousepad Speed - XL - White
£77.99 (inc VAT) / £64.99 (exc VAT)
Pulsar X3 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto Pulsar X3 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto
£117.12 (inc VAT) / £97.60 (exc VAT)
Pulsar X3 CrazyLight Medium Mouse (Wireless/Jet Black/32000dpi/5 Buttons) Pulsar X3 CrazyLight Medium Mouse (Wireless/Jet Black/32000dpi/5 Buttons)
£116.71 (inc VAT) / £97.26 (exc VAT)
Pulsar Superglide for Razer Viper V3 Pro Control White Pulsar Superglide for Razer Viper V3 Pro Control White
£19.49 (inc VAT) / £16.24 (exc VAT)
Pulsar PCMK 3 HE TKL Bruce Lee 85th ED ND Gaming Keyboard Pulsar PCMK 3 HE TKL Bruce Lee 85th ED ND Gaming Keyboard
£142.86 (inc VAT) / £119.05 (exc VAT)
3M 3.5mm Stereo Jack Male to 2x TWIN RCA Phono Male Audio Cable Long Lead G 3M 3.5mm Stereo Jack Male to 2x TWIN RCA Phono Male Audio Cable Long Lead G**Currently Out Of Stock, but can be Pre-ordered Online. Please email us to check restock date prior to ordering.
£1.43 (inc VAT) / £1.19 (exc VAT)
Sub-Total Inc VAT: £1,737.33

Products marked with **Currently Out Of Stock, but can be Pre-ordered Online. Please email us to check restock date prior to ordering. do not exist in the desired quantity in our stock.
Please alter the quantity of products marked with (**Currently Out Of Stock, but can be Pre-ordered Online. Please email us to check restock date prior to ordering.), Thank you.

Please feel free to call our sales staff on 0871 230 0540 who will verify if and when stock will be ready to order.
Continue Shopping Checkout

Delivery Costs

Below are the delivery options and costs which are available, based upon cart contents & chosen country.
UK Delivery prices include VAT. International qoutes are estimates.

Select country to ship to:
Shipping method(s) for United Kingdom
TNT/UK Mail Value Courier 2-3 Working Day
TNT / UK Mail tracked courier (UK Mainland ONLY) [Order delivered in 2-3 working days]£7.99
TNT/UK Mail Premium Courier Next Working Day
TNT / UK Mail tracked courier (UK Mainland ONLY) [Order delivered Next working day]£11.18
Standard: Islands, Highlands and N.Ireland Delivery
3-4 Day delivery service for: Channel Islands, Highlands, Northern Ireland£16.80

Shopping Cart  more
1 x Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Red)
1 x Pulsar PCMK3HE TKL Gaming Keyboard, 80%, ANSI, White
1 x Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, Volt Shadow
1 x Pulsar ZywOo The Chosen Medium Mouse Gen.2 (Wireless/Pink/32000dpi/5 Button
1 x Pulsar Feinmann F01 Wireless Magnesium mouse Alpine White
1 x Pulsar X2 CrazyLight Wireless Gaming Mouse, Mini, T1 (Black)
1 x Pulsar X2 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto
1 x Pulsar Xlite CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5
1 x Pulsar X2N CrazyLight Medium Gaming Mouse (Wireless/Jet Black/32000dpi/5 Bu
1 x Pulsar X2H CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butt
1 x Pulsar Superglide for Logitech G PRO X Superlight 2 Control Black
1 x Pulsar Superglide 3 Glass Mousepad Speed - XL - White
1 x Pulsar X3 CrazyLight Mini Gaming Mouse (Wireless/Jet Black/32000dpi/5 Butto
1 x Pulsar X3 CrazyLight Medium Mouse (Wireless/Jet Black/32000dpi/5 Buttons)
1 x Pulsar Superglide for Razer Viper V3 Pro Control White
1 x Pulsar PCMK 3 HE TKL Bruce Lee 85th ED ND Gaming Keyboard
1 x 3M 3.5mm Stereo Jack Male to 2x TWIN RCA Phono Male Audio Cable Long Lead G
£1,737.33
Information
About us
Conditions of Use
Contact Us
Delivery & Returns
FAQ's
Site Map
Privacy Notice
Follow Us
Like KSN on FacebookFollow us on Twitter!
KSN Independant Customer Reviews
KSN Independant Customer Reviews
KSN Sell the latest Kaspersky 2013 range including Kaspersky internet security 2013, kaspersky antivirus 2013, kaspersky one, kaspersky pure and also Kaspersky Security for Mac
KSN are giving away FREE Live Drive unlimited online backup and storage with every online order over £250!
   About us  |  Conditions of Use  |  Contact Us  |  Delivery & Returns  |  FAQ's  |  Privacy Notice  |  Site Map  

Faster Payments Accepted

Email: sales@ksn-online.co.uk | Telephone: 0871 230 0540

VAT registered
Copyright © 2005-2025 KSN
All rights reserved
Visit KSN on Skinflint